5/37 Howson Way, Bibra Lake WA, Australia

1300 070 343

1300 070 343

  • Home
  • About Us
  • Our Services
    • All Services
    • Electrical Contracting
    • Testing and Inspection
    • Generator Installation
    • EEHA
    • Thermography
    • Project & Shutdown
    • Planning and Scheduling
    • Technical Personnel
  • Projects
    • Projects
    • Butcherbird Expansion
    • Borefield & Mining
    • EEHA
    • Offshore Support
  • News
  • Values
  • Contact Us
  • Blog
  • More
    • Home
    • About Us
    • Our Services
      • All Services
      • Electrical Contracting
      • Testing and Inspection
      • Generator Installation
      • EEHA
      • Thermography
      • Project & Shutdown
      • Planning and Scheduling
      • Technical Personnel
    • Projects
      • Projects
      • Butcherbird Expansion
      • Borefield & Mining
      • EEHA
      • Offshore Support
    • News
    • Values
    • Contact Us
    • Blog
  • Home
  • About Us
  • Our Services
    • All Services
    • Electrical Contracting
    • Testing and Inspection
    • Generator Installation
    • EEHA
    • Thermography
    • Project & Shutdown
    • Planning and Scheduling
    • Technical Personnel
  • Projects
    • Projects
    • Butcherbird Expansion
    • Borefield & Mining
    • EEHA
    • Offshore Support
  • News
  • Values
  • Contact Us
  • Blog

Electrical Installation, Testing & Compliance

Electrical Installation, Testing & Compliance Electrical Installation, Testing & Compliance Electrical Installation, Testing & Compliance

Butcherbird Expansion Project

Two construction workers standing in a trench with measuring equipment.

 Cavell Contracting completed the electrical works for new and relocated site offices and amenities as part of the Butcherbird Expansion Project. 


The scope covered power distribution, generator connections, building supplies and electrical testing across the new and existing infrastructure. 



Cavell’s scope included:

  • Electrical infrastructure: Installation of underground electrical conduits and cabling, distribution board installation and earthing connections. 
  • Generator supplies: Installation and connection of the new generator supply, together with electrical reconnection and earthing configuration changes for the relocated backup generator. 
  • Building connections: Electrical disconnection and reconnection of relocated offices and crib facilities, plus connections for new lunchroom, toilet and shower facilities. 
  • Testing and energisation: Electrical inspections, insulation resistance, earth fault loop impedance and RCD testing, with pre-energisation checks on the new distribution equipment. 
  • Completion and handover: Electrical defect rectification, completed test records and progressive handover of the electrical works. Butcherbird Expansion Project 

The electrical works supported a staged relocation, with new amenities brought into service before existing buildings were disconnected. This required coordination between the new installations and the electrical supplies serving the existing facilities.


Copyright © 2026 Cavell Contracting - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept